Grace & Adam's Mount Joy Kitchen Remodel

A Fresh, Functional Blue Kitchen

Project Goals:
  • Make the layout more functional.
  • Create more storage and counter space. 
  • Modernize the space.

Kitchen Cost Category: Midrange Premium

This kitchen had an interesting layout. The remodel was necessary to provide better function within the existing floor plan.

Mount Joy Kitchen before remodel Mount Joy Kitchen Remodel

Project Overview

Being an older home, this layout did not function well for a modern family. The space was tight and awkward and the client did not like the dark, gloomy, and outdated feel.

It was important to rework the layout to make the kitchen more functional and enjoyable to cook in. Our clients also wanted to brighten up and update the space, make it more their style. However, they did not want to go so modern that the updated space would not fit the with the rest of the house.

Trish Barley Project Designer in Lancaster PA

Project Developer

Trish Barley, AKBD

Matt Wagner Lead Carpenter

Lead Carpenter

Matt Wagner

Design Concepts

Kitchen design rendering
Kitchen design rendering

Scope of Work

Reworking the layout was the priority. It was important that we stayed within the current floor plan and did not remove walls or take any space from other rooms. Everything from the original layout was changed. The sink was moved to where the old stove was. The refrigerator was moved to where the old sink was. The stove was moved to where there used to be double wall ovens. All of these changes increased functionality and flow. 

We removed all the existing cabinetry and appliances. Custom cabinetry, including two strategic pull-outs for storage, was installed to better fit the space. Beautiful navy blue cabinets with complimentary gold hardware were chosen to bring out the blues in the granite countertop while retaining a sense of calm.

A rustic subway tile backsplash helped to bring in some of the historic feel of the rest of the house while still tying into the modern elements of the updated kitchen.

Project Timeline

Project Development Start

June 2, 2022

Production Start

August 16, 2022

Project Completion

October 17, 2022

These clients moved through design fairly quickly. Some product costs and financing held them up a bit, but did not add too much time to their timeline. With ordering materials, product lead times, and scheduling trade partners, they spent a little over a month in pre-production. Once construction starts, a typical kitchen remodel takes about 6-10+ weeks. This project fell right around 8 weeks from the start of construction to the end.