Kirk & Lindsey's Lititz Basement Remodel

From Unfinished to Unforgettable: A Bright, Multi-Purpose Family Space

Project Goals:
  • Create a multifunctional space.
  • Incorporate design elements that bring warmth and character.
  • Maximize function and comfort with smart storage.
Basement Cost Category: Entertainment Zone
Lititz Basement Remodel Before Lititz Basement Remodel after

Project Overview

When this family moved into their home, their unfinished basement offered potential but little function. With a growing son and a desire for more room to gather, play, and relax, they envisioned a transformation that would make the lower level a true part of their home.

Our team delivered a light-filled, multi-purpose basement that balances openness with definition. From the rustic wood accent wall and built-in cabinetry to the fitness area and spa-inspired bathroom, every detail was designed with family life in mind. 

Headshot_Madison Wanner

Project Developer

Madison Wanner

Marsha-Hanna-McLennan-Contracting

Project Manager

Marsha Hanna

Project Gallery

Design Concepts

Lititz Basement design rendering
Lititz Basement gym design rendering

Scope of Work

To bring the family’s vision to life, we transformed the unfinished basement into a thoughtfully designed, functional living space.

The remodel introduced warm wood tones, modern finishes, and purposeful zones for entertainment, fitness, and relaxation.

Key elements included custom built-ins along a reclaimed-wood accent wall, a glass-enclosed gym with mirrors and storage niches, and a stylish full bathroom featuring solid-surface shower panels and a navy vanity.

Every detail—from lighting placement to hidden electrical access—was crafted to make the space feel connected, comfortable, and complete.

Project Timeline

Project Development Start

March 28, 2025

Production Start

July 21, 2025

Project Completion

September 19, 2025

The project development phase took time as the homeowners thoughtfully refined every detail—especially the layout of the gym and the design of the accent wall. They wanted the space to be both functional and visually striking, and their patience during this stage ensured that the final plan was exactly right before construction began. Their pre-production phase was seamless, with clear communication and a well-organized schedule setting the stage for a smooth build. Once construction starts, a typical basement remodel takes about 4-8+ weeks, and this project came in right around the 8-week mark. The build ran smoothly from start to finish, resulting in a space that perfectly reflects the care and intention put into every design decision.